Kaohsiung Rapid Transit Corporation

BANNER

Operational Performance 2021

Safe, Reliable, Convenient, Comfortable

Kaohsiung
Metro

System Length
44.695km
Total Ridership
37.19million

Kaohsiung
LRT

System Length
8.7km
Total Ridership
3.25million
  • 1
    Incidents Rate
    (%)
  • 218.33
    Mean Kilometers Between Failures
    million(MKBF)
  • 99.86
    Punctuality Rate
    (%)
  • 35.27
    Train Speed
    (km/hr)
  • 0.72
    Average Loading Rate
    (Person/m2)
  • 100/97.92
    Train/Station Temperature Acceptance Rate
    (%)